Sections was founded in 2010 by Ali Al-Rubaye. The aim was to participate in the project management and trading industry.
In order to expand
knowledge and experience
within technology such
as weighing systems,
Sections started by
launching branches
outside of the United
Kingdon.
Sections developed the
work within the project
management industry
by supervising different
projects in the United
Kingdom.
New opportunities were
offered in the hospitality
industry. Therefore, in
2016, hotels and restaurants
were in Sections priority.
The company developed outside
of the United Kingdom by
transferring the construction
technologies from the United
Kingdom to the Middle East and
succeeded in supervising different
projects.
Sections is still thriving by
managing different projects in
the United Kingdom and the
Middle East.
Residential Housing, Hertfordshire, UK
Sections was involved in a complex of residential houses, its main role was in completing
all concrete works related to the main buildings foundation structure, Sections used a very
high tech and latest methods related to the construction industry.
Status: Completed
Start date: January 2011
Working period: 14 months
Road & Footpath Works, Barking, London, UK
Sections have been involved in many road and footpaths paving projects, again using latest
tech in this field as it is getting a lot of attention around the world for the high demand on
best asphalt road and pedestrian walkways tech for long lasting periods.
Status: Completed
Start date: May 2011
Working period: 2 months
External and Decorative Works, Chiswick Park
Business Centre, London, UK
One of the very important factors in completing any constructive work by Sections is
finishing or in other term the final touches, as we believe and always emphasis that issue
as it show the high standards and quality provided to our clients. In this project we have
been given the honor to complete all external fascia works (building facade).
Status: Completed
Start date: December 2010
Working period: 12 months
Wealdstone Police Station, Harrow, London, United
Kingdom
This project involves the conversation of the traditional historical Wealdstone Police
Station at 74 High Street into a residential building consisting of 6 - 10 residential units
and 4 commercial units. The project has several restrains to develop this building and to
convert it to a residential building without effecting the traditional designs of some parts
of the building and without effecting the fire chimney of the building which is a part of the
London Community Heritage. The project has been awarded to Sections Contracting &
Trading Ltd and it’s in the design and planning stage.
Status: Completed
Construction Start date: April 2020
Working period: 12 months
Kensington Prime Hotel, Kensington, London,
United Kingdom
In the heart of Kensington, London, this project involved the renovation and change of
use of a House of Multiple Occupation into a 19-room boutique hotel. The building was
re-structured with an addition of a lift, with all electrical, plumbing and servicing works
done. We also added offices in the rear of the hotel for general use as well as a breakfast
area which was built to the highest quality and standards.
Status: Completed
Construction Start date: November 2016
Working period: 16 months
Samad Al Iraqi Restaurant, High Street Kensington,
London, United Kingdom
Sections Contracting & Trading Ltd. Worked closely with Samad Al-Iraqi Restaurant to
plan and build their new branch in Kensington, London. The project involved changing
the interior layout of the restaurant and adding a service lift for orders. The restaurant also
involved mechanical engineering work, especially in areas of increasing ducting sizes and
adding fresh air ventilation into the kitchen in the basement.
Status: Completed
Construction Start date: January 2017
Working period: 22 months
Construction of weighing stations in Iraq (South of
Iraq)
Road works and road safety was one of our company’s priority functions and the reasons
behind us seeking works and jobs that deal with road safety is that the damages that
are caused to roads due to misuse and unconstrained heavy loads will lead to serious
damages to roads that will affect people’s lives and safety, and causes a lot of financial
and economic losses to the communities and the country. The province of Basrah is
Iraq’s only access to the sea and from which Iraq receives and exports all type of goods,
this will certainly lead to the critical damage to road networks in the province due to the
uncontrolled weights and loads of the vehicles using this network. The weighing stations
therefore have been constructed in order to place constrains and put a control to the loads
subjected on the road network.
Sections has executed 21 weighing stations on five different Iraqi southern provinces.
The works of the weighing stations included civil construction tasks in addition to special
technical works that involved the supply and installation of weighing instruments and
road safety features and road furniture such as sign boards, guardrails and road paintings
in addition to a lot of specialized technical and mechanical activities.
Moreover, the company did a training program to the client, staff and employees at
the HQ of the weighing manufacturing and supply company (CW) in the UK to teach
the future weighing stations operators on how to operate and maintain this modern and
advanced system.
Status: Completed
Start date: October 2011
Working period: 7 months
Construction of a Residential Housing complex in
Baghdad – Al-Wafi Residence/ Al-Tajiyat – 3776
housing units.
Sections for project management supervise on the implementation of the Al-Wafi
Residence project in Baghdad /Al-Tajiyat, where the project consists of two types of
buildings; the first type of building which is 28 buildings with 4 floors each on part of
the project area which will be designed in Duplex style and the construction system
used is Isolated Concrete Forms. As for the second type of buildings; they are 17 towers
consisting of 20 floors including two towers located at the front of the project which
is considered as a landmark with a different design in the form an equilateral triangle,
whereas the remaining 15 towers will be in the shape of (Y) from the top view which will
provide the residential units from all sides the view of green spaces. The total residential
units for all complex are (3776) with various designs and sizes.
Status: Under progress
Start date: May 2021
Working period: 84 months
Al Sultan Housing Complex - Al-Najaf Al-Ashraf
Sections is developing a 500,000 M2 plot into a modern residential complex of 6
different types of villa designs forming a total of 1081 residential housing units. The
works also includes the construction of service buildings in the plot such as schools
(4), a health center, a commercial shopping area, a police station and a sports center.
The construction and development of Al-Sultan project involves the infrastructure
works and road works to from scratch to fully functional in the heart of the holy city
of Najaf in Iraq.
This project is being constructed under the supervision of the Al-Najaf Investment
commission.
Status: Completed
Start date: October 2017
Working period: 60 months